MAFC Research

MAFC Phase 4 (2023-2026)

  • MAFC 36: Freight Impacts to Natural Resources and the Environment in State Freight Plans (2026).
  • MAFC 35: Safety Implications of Safety Implications of Truck Regulations: Speed Limitations and Right Lane Only Operations (2026).
  • MAFC 34: Emergency Service Access Along Class I Rail Corridors (2025).
  • MAFC 33: Construction Impacts on Multistate Freight and OSOW Corridors (2025).
  • MAFC 32: All-Hazards Assessments of Major Freight Corridors in the MAASTO Region (2025).
  • MAFC 31: Marine Freight Development in the MAASTO Region (2024).

MAFC Phase 3 (2019-2023)

  • MAFC 30: Preparing for Future Truck Operations: Fleet Electrification and Alternative Fuels (2023).
  • MAFC 29: Maximizing State Marine Freight Planning (2023).
  • MAFC 28: COVID-19 Disruptions: Freight System and Agency Operational Changes Affecting Freight Planning (2022).
  • MAFC 27: Characteristics and Importance of Freight Aviation in the MAASTO Region (2022).
  • MAFC 26: Establishing MAASTO Emergency Divisible Load Management (2021).
  • MAFC 25: MAASTO Regional Freight Alignment: Assets for Freight Movement and Economic Development (2021).
  • MAFC 24: Analysis of Surface Transportation Board Waybill Data for Freight Planning and Operations (2020).
  • MAFC 23: OSOW Support for MAASTO SCOHT and MCC (2019).

MAFC Phase 2 (2016-2020)

MAFC Phase 1 (2011-2016)

Pre 2011 – CFIRE